BASICS
Basic physical conditions required to compact soil.
![Grundlagen](https://www.vibroflotation.com/wp-content/uploads/sites/19/2024/01/Grundlagen.jpg)
VIBROCOMPACTION METHOD
Method in which the vibroflot penetrates the soil with the addition of a water-air mixture. In this method, the local material is densified in the lower area of the vibroflot. As materal is consumed a crater is formed at the surface that is either backfilled or leveled.
![WTF-definition](https://www.vibroflotation.com/wp-content/uploads/sites/19/2024/01/WTF-definition-scaled.jpg)
THE DRY BOTTOM FEED SYSTEM
Process in which dry gravel is added via a silo tube and material tube to the bottom of the vibroflot. The gravel is compacted in steps from the bottom upwards to the desired level.
![DryBottonFeed](https://www.vibroflotation.com/wp-content/uploads/sites/19/2024/01/DryBottonFeed.jpg)